A total of 144 solar panels were installed on the rooftop of the Bishop Hall Jubilee School campus with a total capacity of 50 kW. It is projected that the system will produce 57,000 kWh of electricity each year, equivalent to the monthly electricity consumption of 160 four-person households, generating annual tariff revenues of HK$230,000. The reduction in carbon dioxide emission resulting from this solar project will be 28,500 kg per annum, equivalent to 1,240 trees planted.
The solar panel system is supplying electricity throughout the territory, through the connection to the CLP grid. Under the scheme, CLP will pay for our generated electricity at a rate much higher than their selling price, at least for the next 15 years.
Dr. Lee Yui Bor, an alumnus graduated in 1965, who is also our IMC manager, fully funds the project and oversees the technical aspect of the work.
He wishes that the revenue generated from the FiT Scheme will be used to
1. provide funding for the Mrs. Helen Wong Memorial Scholarship and the Mr. Chan Chee Yum Scholarship.
2. provide financial assistance to our needy students.
3. support our environmental and STEM education.
The above two scholarships were set up by Dr. Lee, helping a lot of Jubileans for many years.
We sincerely thank Dr. Lee for his tremendous contributions to our school.
Time | Key Project Milestones |
March - June 2019 | Waterproofing works on the rooftop |
July 2019 | Installation of solar panels |
Early August 2019 | Test and Commissioning |
8th August 2019 | System Completion |
Apart from the cost and environmental benefits, our school also utilizes the project to educate our students in different subjects:
Solar Power ProjectProject ScopeA total of 144 solar panels were installed on the rooftop of the Bishop Hall Jubilee School campus with a total capacity of 50 kW. It is projected that the system will produce 57,000 kWh of electricity each year, equivalent to the monthly electricity consumption of 160 four-person households, generating annual tariff revenues of HK$230,000. The reduction in carbon dioxide emission resulting from this solar project will be 28,500 kg per annum, equivalent to 1,240 trees planted. The solar panel system is supplying electricity throughout the territory, through the connection to the CLP grid. Under the scheme, CLP will pay for our generated electricity at a rate much higher than their selling price, at least for the next 15 years. Project FundingDr. Lee Yui Bor, an alumnus graduated in 1965, who is also our IMC manager, fully funds the project and oversees the technical aspect of the work. 1. provide funding for the Mrs. Helen Wong Memorial Scholarship and the Mr. Chan Chee Yum Scholarship. The above two scholarships were set up by Dr. Lee, helping a lot of Jubileans for many years. We sincerely thank Dr. Lee for his tremendous contributions to our school. Project Timeline
Educational Plans in Different SubjectsApart from the cost and environmental benefits, our school also utilizes the project to educate our students in different subjects: Chinese
English
Liberal Studies
Physics
Integrated Science
Geography
Visual Arts